NIGERIA POWER STATIONS/PLANTS…

 

inferno TV

1. Kanji PSR(1968) 760mw.
2. Jebba Hydro PSR(1985) 576.8mw.
3. Shiroro PSR(1990) 600mw.
4. Egbin TPS(1985/6) 1320mw.
5. Sapele PS(1981) 1020mw.
6. Ugheli PS 972mw.
7. Afam 1 – 5 PS(1982&2002) 977mw.
8. Geregu 1 PS(2007) 414mw.
9. Omotosho 1 PS(2006) 335mw.
10. Papalanto(Olorunsogo) (2007) 335mw.
11. Kwale Okpai PS (2005) 480.
12. Afam 6 (2010) 642mw.
13. Ibom PS (2009) 500mw.
14. AES Barge(2001) 270mw.
15. Omoku PS(2005) 150mw.
16. Trans Amadi 136mw.
17. Rivers IPP 180 mw.
18. Aba PS(2012) 140mw.
19. Geregu 2 (2012) 434mw.
20. Sapele PP(2012) 450mw.
21. Alaoji PS(2015) 1074mw.
22. Olorunshogo 2 PS 675mw.
23. Omotosho PS 2 (2012) 450mw.
24. Omoku PS2 225mw.
25. Ihovbov PS (2012) 450mw.
26. Egbema PS(2013) 338mw.
27. Calabar PS 561mw.
28. Gbarain PS 225mw.

 

Under construction/Propose before Buhari took over(75 – 95% completion).

 

29. Mambila PS 3050mw.
30. Itobe PS 1200mw.
31. Azura TPS 450mw.
32. Kano PS 100mw.
33. Qua Iboe PS 540mw.
34. Zungeru PP 700mw.
35. Kaduna PP 215mw.
36. Gurara pp 40mw.
37. Dadin Kowa HPP 29mw.
38. Okpai 2 PP 480mw.

 

OBJ constructed and commissioned four(4)
GEJ constructed and commissioned six(6), started additional ten(10)ranging from 75 to 95% completion in hope that by now we would have reached 21,493.8 MEGAWATTS “capacity” if not consumption.

 

Buhari has been busy looting and making noise. HE IS INDEED LIFELESS!!!

The post NIGERIA POWER STATIONS/PLANTS, THE TRUTH SO FAR And Buhari has been busy looting and making noise, HOPE FOR NIGERIA Reports appeared first on Happenings In Nigeria.